Sonotube & concrete pier calculator

Compute exact cylindrical concrete volume, 80-lb bag totals, and ready-mix cubic yards for deck footings, porch columns, and pergola piers.

  1. 1 Measure
  2. 2 Set your price
  3. 3 Quote & PDF
Freshly poured concrete patio slab inside wooden forms

1 Measure

Flat slab, L-shaped slab, or round piers
Ready-mix truck delivery or store bags
Diameter across each round tube
in
Depth from ground to bottom of hole
ft / in
Total footing holes to pour
piers
Buffer so you don’t run short

2 Set your price

USD
Per piers (8 piers total)
$ / piers
Delivery, haul-off, or site prep
USD
Added on materials & labor
%
Local store material tax rate
%
Live layout answer
Buy 35 bags of concrete

Pours 8 round piers at 3' 0" deep (+10% hole buffer).

PIER FOOTING SCHEDULE • 8 CYLINDRICAL SONOTUBES P1 P2 P3 P4 P5 P6 P7 P8 Ø 12" × 3' 0" Deep
Pier footprint
6 sq ft
Gravel base
None
Reinforcement
Concrete only

3 Quote

Rounded to real store units. Edit any unit price to match your local supplier:

MaterialBuy qtyUnit (USD)Cost
Pre-Mixed Concrete Bags (80lb)
35 individual bags (+10% waste)
35 bags$226.80
12" Fiber Concrete Form Tubes (4 ft)
8 piers @ 3' 0" deep
6 tubes$99.00
Store materials
$325.80
Labor & setup
$310.00
Your take-home
$218.95
Customer total
$828.35
Customer quote
$828.35

Sonotube diameter & concrete bag chart

Exact cylinder formula and bag yields per pier at 36″ and 48″ frost depths.

Part of our Concrete Calculator Suite: Need a broader takeoff or custom job settings? Switch back to the full concrete slab & pier calculator.

Formula & waste allowance

One pier (ft³) = π × (Diameter in ÷ 24)² × (Depth in ÷ 12) Total 80-lb bags = ceil([One pier ft³ × Pier count ÷ 0.60] × [1 + Waste %])

Cylindrical footing volume scales with the square of the tube diameter: jumping from an 8-inch to a 12-inch Sonotube more than doubles the concrete required per hole. Always pour piers below your local frost line and set post bases on wet-set or wedge anchors.

Quick sizing chart

Sonotube diameterVolume per 1 ft depthAt 36″ deep (80-lb bags)At 48″ deep (80-lb bags)
8″ diameter tube0.35 ft³1.05 ft³ (2 bags)1.40 ft³ (3 bags)
10″ diameter tube0.55 ft³1.64 ft³ (3 bags)2.18 ft³ (4 bags)
12″ diameter tube0.79 ft³2.36 ft³ (4 bags)3.14 ft³ (6 bags)
16″ diameter tube1.40 ft³4.19 ft³ (7 bags)5.59 ft³ (10 bags)

Worked example: Eight 12″ Sonotube deck piers, 36″ deep

  1. Radius in feet: 12″ diameter ÷ 2 = 6″ radius = 0.50 ft.
  2. Volume per pier: 3.1416 × (0.50)² × 3.0 ft = 2.356 cubic feet per pier.
  3. Total volume (8 piers): 2.356 × 8 = 18.85 cubic feet (0.70 yd³ net).
  4. 80-lb concrete bags: 18.85 ÷ 0.60 = 31.4 bags × 1.10 waste → order 35 bags (80-lb).

Jobsite checklist

  • Confirm local frost line depth (30″ to 48″+ in northern climates) with your building inspector.
  • Place 4″ to 6″ of compacted #57 drainage stone at the bottom of each augered hole if required locally.
  • Extend Sonotube 2″ to 6″ above finished grade so wood posts stay dry above splashback.
  • Insert two vertical #4 rebar sticks and a galvanized standoff post base before concrete sets.

Common questions

How many 80-lb bags of concrete fill a 12-inch Sonotube 4 feet deep?

A 12-inch diameter tube 48 inches (4 ft) deep holds 3.14 cubic feet. Divided by 0.60 cubic feet per 80-lb bag, each pier needs 5.24 bags net, so plan on 6 bags per pier with waste.

What size Sonotube is needed for a 6×6 deck post?

A 6×6 post (5.5″ × 5.5″ actual, 7.78″ diagonal) requires at least a 10-inch or 12-inch Sonotube pier so the post base has proper concrete edge distance and meets IRC R507 footing bearing area.

Do I need a belled footing base at the bottom of a Sonotube?

Heavy tributary deck loads or weak clay soils often require a wider Bigfoot footing base (16″ to 24″) at the bottom of a 10″ or 12″ tube to prevent settling and frost heave. Add roughly 1.5 to 3 extra 80-lb bags per belled base.

More concrete calculators