Deck board & framing calculator

Deck boards, joists, beams, hangers and concrete piers.

  1. 1 Measure
  2. 2 Set your price
  3. 3 Quote & PDF
New wooden deck seen from below showing the beam and footings

1 Measure

Left-to-right length against the wall
ft / in
How far the deck extends into the yard
ft / in
Surface boards on top of the frame
Use freestanding over brick or stone walls
Distance between frame joists underneath
45° diagonal uses 15% extra for angle cuts

2 Set your price

USD
Per sq ft (192 sq ft total)
$ / sq ft
Delivery, haul-off, or site prep
USD
Added on materials & labor
%
Local store material tax rate
%
Live layout answer
28 boards and 13 joists

Covers 16' 0" × 12' 0" deck footprint supported on 4 piers (ledger).

FRAMING & SURFACE CUTAWAY • 16" O.C. JOISTS (LEDGER) HOUSE LEDGER BOARD (FLASHED) Width: 16' 0" 12' 0" Left: Framing & Piers | Right: PT-PINE (straight) | Joists: 16" O.C.
Footprint
16' 0" × 12' 0"
2×10 joists
13 joists @ 16" OC
Footing piers
4 piers (ledger)
Sub-Frame Joist Spacing Verified: 16" O.C. framing matches pt-pine straight installation standards.

3 Quote

Rounded to real store units. Edit any unit price to match your local supplier:

MaterialBuy qtyUnit (USD)Cost
5/4×6 × 16 ft Pressure-Treated Pine Decking
Straight layout (+10% cut waste)
28 boards$525.00
2×10×12 ft Pressure-Treated Joists & Rim
13 joists @ 16" O.C. + 2 rim/ledger boards
15 boards$373.50
2×10×16 ft Built-Up Support Beam Plies (2-Ply)
1 main outer drop beam
2 boards$49.80
12" Concrete Footing Pier + 6×6 Post Base Hardware
4 piers (4 per beam line) w/ 3 bags 80-lb concrete each
4 piers$144.00
2×10 ZMAX Galvanized Joist Hangers + Structural Screws
Corrosion-resistant ACQ-rated connectors
13 hangers$44.85
#10 × 2-1/2" Coated Star-Drive Deck Screws (350 ct)
Covers 192 sq ft surface
2 boxes$69.00
Store materials
$1,206.15
Labor & setup
$4,474.00
Your take-home
$5,644.04
Customer total
$7,224.57
Customer quote
$7,224.57

Deck framing & board reference

Board coverage, joist spacing, and ledger vs. freestanding beams.

Formula & waste allowance

Deck area (sq ft) = Width along house (ft) × Projection (ft) 16-ft boards = ceil([Area ÷ 7.58 sq ft/board] × [1 + Waste %]) Joists = ceil(Width (in) ÷ Joist spacing) + 1 + Rim boards

One 16-ft nominal 5/4×6 board (5.5″ wide + 3/16″ gap) covers 7.58 sq ft. Straight layouts add 10% waste; 45° diagonal layouts add 15% waste and require 12″ joist spacing on composite boards.

Quick sizing chart

Decking typeMax joist spacingFastenersWaste allowance
5/4×6 wood (straight)16 in O.C.2.5″ coated deck screws+10% for end cuts & knots
5/4×6 wood (45° diagonal)12 – 16 in O.C.2.5″ exterior deck screws+15% for mitered ends
Composite (straight)16 in O.C.Hidden grooved clips + starters+10% for end cuts
Composite (45° diagonal)12 in O.C. requiredHidden clips (extra clip count)+15% for mitered ends

Worked example: 16′ × 12′ attached ledger deck (192 sq ft)

  1. Surface deck boards: 192 sq ft ÷ 7.58 sq ft/board = 25.3 net × 1.10 waste → 28 boards (16-ft).
  2. 2×10 floor joists: 192″ width ÷ 16″ spacing + 1 = 13 joists plus ledger and outer rim board.
  3. Drop beam & piers: Doubled 2×10 outer beam on 3 concrete piers with 6×6 post bases and 13 hangers.
  4. Waterproofing: Metal Z-flashing over house ledger plus butyl tape along every joist top.

Jobsite checklist

  • Flash the house ledger with membrane and metal Z-flashing.
  • Install ZMAX or stainless hangers with structural hanger screws.
  • Add solid mid-span blocking over the drop beam to prevent joist roll.
  • Build 36″+ guardrails (<4″ baluster gap) if deck exceeds 30″ off grade.

Common questions

Does composite decking require 12-inch or 16-inch on-center joist spacing?

Most grooved composite and PVC deck boards (such as Trex or TimberTech) are rated for 16-inch on-center joist spacing when laid perpendicular (straight) across joists, but require 12-inch on-center joist spacing when installed at a 45-degree diagonal because the diagonal span across 16-inch joists increases to 22.6 inches.

When must a backyard deck be freestanding instead of attached with a ledger board?

A deck must be built freestanding (with a second drop beam and concrete piers near the house wall) whenever the house rim joist is inaccessible, cantilevered, brick veneer, stone masonry, stucco over foam sheathing, or manufactured housing that cannot legally support structural lag/tension bolts.

How many 16-foot 5/4×6 deck boards cover 100 square feet?

A nominal 5/4×6 deck board measures 5.5 inches wide. Including a standard 3/16-inch drainage gap (5.6875-inch effective coverage), one 16-foot board covers 7.58 square feet. Therefore, 100 square feet requires 13.2 boards net, or 15 boards after a 10% straight-lay waste allowance (16 boards for 45-degree diagonal layouts).

How are concrete deck piers spaced along a dropped support beam?

Typical double or triple 2×10 / 2×12 dropped beams support post spacings between 6 and 8 feet depending on joist span and live-load tables (40 psf live + 10 psf dead load under IRC R507). Always verify exact beam and footing diameters against your local municipal span table and soil bearing capacity.

Why include joist butyl flashing tape on pressure-treated framing?

Applying self-adhering butyl flashing tape over the top edge of pressure-treated joists and double beams seals deck screw penetrations and blocks standing water between deck boards, extending framing lifespan to match 25-to-50-year composite decking warranties.