Rounded to real store units. Edit any unit price to match your local supplier:
| Material | Buy qty | Unit (USD) | Cost |
|---|---|---|---|
Pre-Mixed Concrete Bags (80lb) 1 full pallet(s) + 20 loose bags (+10% waste) | 62 bags | $401.76 | |
3/4" Crushed Stone Sub-Base (Compacted) 4" compacted base (+10% compaction factor) | 2 tons | $96.00 | |
6x6 W1.4/W1.4 Welded Wire Mesh (5×10 ft Sheet) Includes 15% overlap allowance &dobie chairs | 3 sheets | $58.50 | |
2×4×12 ft Form Lumber 40 lin ft perimeter forming | 4 boards | $31.40 | |
24" Steel/Wood Form Stakes (Bundle of 10) Spaced every 3 ft (14 stakes total) + duplex nails | 2 bundles | $44.00 |
80-lb & 60-lb concrete bag reference
Exact bag yields per cubic yard, pallet sizes, and hand-mix break-even rules.
Formula & waste allowance
Pre-mixed concrete bags yield 0.60 cubic feet per 80-lb bag and 0.45 cubic feet per 60-lb bag. Always add 10% waste for uneven subgrade depths, and consider ready-mix once a pour exceeds 80 to 90 bags (about 1.75 to 2.0 cubic yards).
Quick sizing chart
| Pour size (4″ thick) | Cubic yards | 80-lb bags (+10%) | 60-lb bags (+10%) |
|---|---|---|---|
| 4′ × 4′ AC / generator pad | 0.20 yd³ | 10 bags | 14 bags |
| 8′ × 8′ grill or shed pad | 0.79 yd³ | 40 bags | 53 bags |
| 10′ × 10′ patio slab | 1.23 yd³ | 62 bags | 82 bags |
| 12′ × 12′ patio (borderline) | 1.78 yd³ | 88 bags | 118 bags |
Worked example: 10′ × 10′ patio pad at 4″ thick using 80-lb bags
- Net volume: 10 ft × 10 ft × (4 ÷ 12) ft = 33.33 cubic feet (1.23 yd³).
- Net 80-lb bag count: 33.33 ft³ ÷ 0.60 ft³ per 80-lb bag = 55.6 bags.
- Waste allowance: Multiply by 1.10 (+10% subgrade waste) → 62 bags of 80-lb concrete.
- Pallet & weight check: 62 × 80 lb = 4,960 lbs (about 1.5 pallets at 42 bags/pallet; plan two truck trips or delivery).
Jobsite checklist
- Check truck payload before loading: one pallet of 42 eighty-pound bags weighs 3,360 lbs.
- Keep 2 to 3 spare bags dry on site; unopened bags return easily while running short ruins a cold joint.
- Measure clean mixing water per bag (about 3 quarts per 80-lb bag) so slab strength stays near 4,000 PSI.
- For pours over 1.75 yd³, compare bag labor plus delivery against a ready-mix short-load quote.
Common questions
How many 80-lb bags of concrete do I need for a 10×10 slab at 4 inches thick?
A 10 ft × 10 ft × 4 in concrete slab holds 33.33 cubic feet (1.23 cubic yards). At 0.60 cubic feet per bag, that takes 56 bags net, or 62 bags of 80-lb concrete after a standard 10% waste factor.
How many 60-lb bags equal one 80-lb bag of concrete?
An 80-lb bag yields 0.60 cubic feet and a 60-lb bag yields 0.45 cubic feet, so four 60-lb bags equal three 80-lb bags (1.80 cubic feet total).
How many bags of concrete fit on a pallet?
Most home centers stack 42 bags of 80-lb concrete (3,360 lbs) or 56 bags of 60-lb concrete (3,360 lbs) on a single pallet.